西西444www大胆无码视频|欧美精品v国产精品v竹菊影视|欧美乱妇日本无乱码特黄大片|亚洲中文字幕人成乱码亚洲色,男女无遮挡xx00动态图120秒,嫩BBB槡BBBB搡BBBB,男JI大巴进入女人的视频,奶头被民工们吸得又红又肿怎么办,男人天堂av,母亲的朋友,男人的好电视剧免费观看高清,母亲8免费完整高清电视剧在线看,男朋友把舌头都伸进我的嘴巴里了,母亲6电视剧免费观看 ,日韩亚洲AV人人夜夜澡人人爽_91在线看片福利无码_亚洲一区二区无码中文字幕日_国产精品扒开腿做爽爽爽的小说 ,国产精品无码一级免费看A级毛激情_国产精品无码一区免费看_日韩亚洲av人人夜夜澡人人爽_亚洲最新av片不卡无码久久_中文字幕人妻第一区_国产欧美综合在线观看_天天av天天爽无码中文_中文字幕久久久久久久免费蜜桃麻豆_91中文字幕午夜福利亚洲天堂成人国产三级_欧美亚洲精品一级毛淫片_国产在线视频一区二区高清乱码99

超低CEMS系統(tǒng)
Current Location: Home >> Case >> Power Industry

Shanghai Shidongkou No.2 Factory

2019-05-20
0次
Shanghai Shidongkou No.2 Factory
Detail:

Shanghai Shidongkou Power Generation Co., Ltd. and Shanghai Shidongkou No. 2 Power Plant are both enterprises jointly built by the central and local governments of China. Later, China Huaneng Group acquired all the shares of these two power plants and changed them into branch plants. In 2005, Huaneng cooperated with the Shanghai Municipal Government to build a Shanghai gas turbine power plant on the vacant land between the two plants, bringing the total installed capacity of the entire Shidongkou Power Generation Base to 3.45 million kilowatts.

Shanghai Shidongkou Power Generation Co., Ltd., a modern thermal power plant of more than one million kilowatts built in Shanghai, is also a key construction project of the seventh five-year plan in Chinese Mainland. It was started in 1985 and completed in 1990. The power plant is jointly built by the central and local governments, and four 300000 kilowatt domestic generating units are installed (the model of steam turbine generator unit is N300-165/535/535, and four boilers are made by Shanghai Boiler Factory, which are sub critical, primary rise, tertiary mixing, and intermediate reheat single furnace coal-fired once through boilers. The boiler model is SG-1025-170.5-540/540). However, the technical and economic benefits are average. Later, Shenneng Co., Ltd., which was held on behalf of the Shanghai Municipal Government, transferred all its rights and interests. After several transfers, Huaneng International Power Co., Ltd., a subsidiary of China Huaneng Group, acquired all the shares of the plant twice in 2002 and transformed it into Shidongkou Power Plant.

At that time, the Second Power Plant was also started in 1988, and was invested equally by China Huaneng Group and Shenneng Co., Ltd. In 1999, Huaneng announced that it would purchase 49.34% of the assets and interests of Shenneng in Huaneng Shanghai Shidongkou No.2 Power Plant in a lump sum buyout payment of 3.5 billion yuan, and then inject the entire power plant into Huaneng International Power Co., Ltd. Shidongkou No.2 Power Plant is a power plant using supercritical units in Chinese Mainland. It is equipped with two 600000 kilowatt units. The main equipment is imported from Switzerland and the United States. The power plant was built in 1992. It was one of the power plants with advanced equipment, good economic benefits, high operating efficiency and clean environment in China at that time, and became a model for many new power plants since then.

Shanghai Gas Turbine Power Plant is located between Shidongkou Power Plant and No. 2 Power Plant. Three gas steam combined cycle units with a power generation capacity of 350000 kilowatts are installed, using natural gas from the West East Gas Transmission Project as fuel. The power plant was originally the second phase expansion project of the Second Power Plant, which was intended to install coal-fired units. Later, due to the new environmental requirements of the Shanghai Municipal Government, it was changed to a gas turbine unit, which was approved for construction in 2003. However, since then, Huaneng's management has been worried that the higher gas price cost will lead to poor economic benefits of the power plant, so it has not started construction for a long time. However, with the rise of coal price and the implementation of macro-control by the state, Huaneng finally had to re operate the project and officially started construction in 2005.

We, Shanghai Beifen Technology Co., Ltd., provided a set of SBF800 super clean emission wet flue gas dust meter for 600MW unit of 1 # boiler of Shanghai Huaneng Shidongkou Power Plant in November 2015. After the supply, we Shanghai Beifen Technology Co., Ltd. actively responded to the requirements of the power plant, and cooperated in guiding the installation and debugging. And cooperated with the power plant to complete the environmental protection acceptance. In December, we won the operation and maintenance of Shanghai Huaneng Shidongkou Power Plant. Make positive response to the operation and maintenance of the power plant for a long time. The power plant has highly evaluated our service.


previous:None

Related products

Related news

Contact

    Tel:+86 21 58557312

    Email:sales@sh-baif.com

    Address:Building 2, South Area, Zhangjiang First Field, No. 33 Chuantu Road, Pudong New Area, Shanghai

巢湖市| 九龙坡区| 白水县| 太仓市| 五家渠市| 扎鲁特旗| 平安县| 宜城市| 通城县| 翁源县| 淮安市| 宝丰县| 梁河县| 濉溪县| 昌宁县| 赣榆县| 胶州市| 高平市| 五常市| 灵武市| 宜兰县| 灵石县| 斗六市| 南江县| 叙永县| 祁门县| 锡林浩特市| 英山县| 新宁县| 淳安县| 于都县| 石柱| 开远市| 靖西县| 泾川县| 凤冈县| 牙克石市| 辰溪县| 炉霍县| 桃园市| 吉隆县|